|
|
| Search |
 |
|
| Customer Service |
 |
|
|
|
|
 |
Our gazebo booths are made from high-impact, UV-resistant PVC plastic and marine-grade vinyl. They are available in 8 foot models, with as many as five service counters and under-counter shelves.
Two people can assemble a gazebo in about ten minutes and take it back
down just as quickly. Carrying bags are included to make transportation
easy.
Contact us for information on 10 and 12 foot models.
|
|
 |
| Displaying 1 to 2 (of 2 products) |
Result Pages: 1 |
|
Gazebo Assembly Instructions
Step One: Unfold Bottom Frame
Unfold the Gazebo frame into a hexagonal shape, making sure that the snaps are facing out. Step Two: Build Dome
Remove the ribs and hub from their carrying bag and build the dome of the Gazebo.
Begin this by locking the top ribs (ribs with snap buttons) into the
hub. Once all six top ribs are connected to the hub, lock the bottom
ribs (belled ribs) into the top ribs. Step Three: Raise Dome
With two
people, each holding two ribs on opposite sides, lift the dome over the
bottom frame. Insert the slotted ends of the bottom ribs into the
fittings on the hinged Gazebo corners. Step Four: Attach Skirt
Remove the
vinyl skirt from its carrying bag. Stand the roll on end and make sure
that the snaps are at the top. Begin by snapping the skirt to the four
vertical snaps at one end of the bottom frame. Unroll the skirt around
the frame, snapping it once at the center of each side and twice on the
corner hinges.
Step Five: Attach Canopy
With
two people, each holding two corners on opposite sides of the canopy,
toss it up over the top of the Gazebo, keeping hold of one corner. Snap
those corners in place and pull down the other four corners and snap
them into place. Step Six: Attach Counter Supports
Remove
the counter support pieces from the counter carrying bags. Each counter
support assembly consists of two legs and an upper and lower brace (and
middle brace if your unit contains middle under-counter shelves).
Snap two counter legs onto the lower frame rails, on either side of a
center post. Snap the lower counter brace between the legs. Then slide
the upper brace over the top of the counter legs.
ibs and hub from their carrying bag and build the dome of the Gazebo.
Begin this by locking the top ribs (ribs with snap buttons) into the
hub. Once all six top ribs are connected to the hub, lock the bottom
ribs (belled ribs) into the top ribs.
 Step Seven: Place Shelves & Counters
Lower under-counter shelves just lay into place atop the counter legs and lower brace.
Middle shelves require installing the middle shelf bracket by snapping
it just over the screws on the counter legs and center post.
Position the counter on the upper brace and the rails of the Gazebo
frame. It should overhang about 1/4 of an inch off the front of the
Gazebo. The velcro will hold it in place. |
|
|